AA

Vienna-Penzing: Resumption of Construction Work on Deutschordenstraße

On Tuesday, April 15, the city of Vienna will resume road construction work for the establishment of a cycling facility and redesign measures on Deutschordenstraße and Linzer Straße in Vienna-Penzing.

On Deutschordenstraße, a structurally separated two-way bike path approximately 315 meters long and 2.60 meters wide will be constructed on the side with even house numbers. Additionally, new benches will be installed. The intersection of Deutschordenstraße/Linzer Straße will be redesigned, and the bike path will be extended to Lorenz-Weiß-Gasse.

Traffic Measures During Construction Work on Deutschordenstraße in Vienna-Penzing

The work on Deutschordenstraße will be carried out while maintaining traffic. During the construction period, Linzer Straße from the intersection with Deutschordenstraße to and in the direction of Müller-Guttenbrunn-Straße will be operated as a temporary one-way street. Traffic in the opposite direction will be diverted from Kinkplatz via Ernst-Bergmann-Gasse and Hütteldorfer Straße to Linzer Straße. Pedestrian traffic will remain in place.

Location of the construction site: 14th district, Deutschordenstraße between Keißlergasse and Linzer Straße
Start of construction: April 15, 2025
Planned end of construction: May 4, 2025

For more information, visit here or call +43 1 955 59 - Infoline Street and Traffic.

More on Vienna's Urban Development

(Red)

This article has been automatically translated, read the original article here.

  • VIENNA.AT
  • English News
  • Vienna-Penzing: Resumption of Construction Work on Deutschordenstraße
  • Kommentare
    Kommentare
    Grund der Meldung
    • Werbung
    • Verstoß gegen Nutzungsbedingungen
    • Persönliche Daten veröffentlicht
    Noch 1000 Zeichen